The template pack includes the following documents:
Proposal Templates (Word)
$19.99
Use these 10 x 28-page Microsoft Word templates to write concise, effective, and comprehensive business proposals. The success of a proposal depends on how describe WHAT you are proposing, HOW you plan to do it, WHEN you plan to do it, and HOW MUCH it is going to cost. This proposal template was designed with these requirements in mind. It contains the basic components of a business proposal: start (the Executive Summary), middle (the Body of material to be presented) and an end (the Conclusion).
- 3 x Proposal templates 28 pages each
- Projects Costs 1 x worksheet
- Work Breakdown Structure (WBS) 1 x worksheet
Whats’s included in the template pack
The package also includes two additional Microsoft Word templates, which have the same material but different cover sheets in case you have a preference.
All of the templates can be modified very easily and contain no macros, embedded files or other type of plug-ins. The branding and logos can be removed by simply deleting the images from the cover sheets. These templates are in Microsoft Word and Excel format and can be downloaded immediately online.
The template pack includes the following documents:
- 10 x Proposal templates – 28 pages each
- 1 x Projects Costs worksheet
- 1 x Work Breakdown Structure (WBS) excel spreadsheet





































